SymbolsTransformerRelayPower-SystemBasic-electricalACSR-ConductorCircuit-BreakerInterview-questions-of-Basic-ElectricityInterview-questions-of-transformerInsulatorCurrent-TransformerMCQMCQ-powersystemThermal-power-stationInterview-questions-of-Power-SystemPower-ElectronicsInterview-questions-of-Underground-CableInterview-questions-of-IlluminationIlluminationMCQ-of-ElectronicsMCQ-of-Basic-ElectricalMCQ-of-Transformers MCQ-of-D.C-motor MCQ-of-D.C-generatorsMCQ-Control-SystemMCQ-Measurementsmcq-of-Generation-power-systemMCQ-of-Induction-MotorMCQ-of-Transmission-DistributionMCQ-of-Electrical-MachinesMCQ-of-Alternator-and-Synchronous-MotorsMCQ-Electric-Power

This is an electrical engineering base website. Our electricalunits.com ‘s team has tried to make an easy to learn website. This website will help you to study all subjects of electrical engineering base. All articles on this side is very easy to learn. This website will be very helpful in the course on the power system, machine, basic electrical, electronics, particularly design and project work, of the undergraduate and postgraduate students, and to those preparing for professional examinations. And this website deals exhaustively with all aspects of Sub-Station design and layout, and with all the equipment involved so as to give a thorough understanding of the subject. Therefore, this website will appeal both to advanced students in electrical engineering as also to working engineers in the field of electrical power system design and operation.

 

Recent Post

Multiple Choice Question (MCQ) of Transmission and Distribution page-3:
21. ACSR conductor implies
A) Anodized Core Smooth Run
B) Anode current sinusoidally run
C) Aluminium conductor steel reinforced
D) All conductors surface treated and realigned.

Read more..

Multiple Choice Question (MCQ) of Transmission and Distribution page-2:
11. In overhead transmission lines the effect of capacitance can be neglected when the length of line is less than
A) 80 km
B) 100 km
C) 160 km
D) 200 km.

Read more..

Multiple Choice Question (MCQ) of Transmission and Distribution page-1:
1. Which of the following is not the transmission voltage in India ?
A) 400 kV
B) 264 kV
C) 132 kV
D) 66 kV.

Read more..

Multiple Choice Question (MCQ) of Power Generation page-12:
111. Load shedding is possible through
A) voltage reduction
B) frequency reduction
C) switching off the loads
D) any of the above.

Read more..